Mineral Resources

ONSLOW

LOCATION: PiLBARA, WA
COMPLETION: ONGOING

REGROUP has moved over 1.5million tonnes of material and Ore for MinRes. Onslow Iron is one of the largest iron ore projects currently under development in Australia, set to ship billions of tonnes of ore from the Pilbara region. In May 2024, REGROUP contributed to delivering the first ore on the ship, which was achieved ahead of schedule. This was possible with the 30+ Assets of Prime Movers and trailers that REGROUP have on site. As well as moving ore for MinRes, REGROUP assisted with the civil construction of the MinRes Haul Road with the addition of 30+ Civil and Mining plants to assist with works.

THE SOLUTION
  • Successfully transported over 1.5 million tonnes of material and ore
  • Aided in the civil construction of a haul road, for site accessibility
  • Managed and maintained a fleet of over 30 prime movers and trailers, plus additional civil and mining equipment
  • Provided both wet and dry hire for earthmoving and mining equipment to adapt to project needs.
  • Contributed to the first ore shipment delivery ahead of schedule 
  • Ensured operational efficiency with comprehensive on-site maintenance of all equipment